A note from the team at Secure Top Roofing. After years of re-roofing Dublin semis, we learned the same lesson again and again: homeowners want clarity more than anything. This guide gives you the line items, the timeline, and the upgrade choices so you can make a calm, confident call.
Start 2026 with a roof that will not need patching every winter. If you are planning a Dublin 3-bed semi re-roof, this guide shows what is included, how long it takes, and where you can upgrade without overspending.
Quick Answer: A Dublin 3-bed semi re-roof package in 2026 usually includes:
- Strip and deck check, then safe disposal
- New breathable felt and treated battens
- Ridge rebuild or dry ridge upgrade
- Leadwork renewal around chimneys and valleys
- Site protection, waste removal, and final cleanup
- A 7-10 working day timeline (weather dependent)
- Optional upgrade bundles: dry verge, gutter refresh, insulation top-up
- Typical savings of 10-18% vs larger Dublin roofing firms
Keep reading for the full line-by-line breakdown, upgrade bundles, and the exact 7-10 day schedule.
We work across Dublin 15 and beyond, from Blanchardstown and Castleknock to Clonsilla, Mulhuddart, and Tyrrelstown. The wind and rain in Dublin 1-24 are relentless, so the details matter.
Book Your 2026 Re-Roof Assessment
Ready to fix your roof? Get a detailed, no-obligation quote from Dublin 15's trusted roofing experts. Most quotes provided within 24 hours.
Free inspection - 7-10 day timeline - Local Dublin team
Why 2026 Re-Roof Packages Beat Piecemeal Repairs
Patching is tempting. It feels cheaper today. But in Dublin, one winter can turn three small patches into a full redo anyway.
A package approach gives you one scope, one timeline, and one clear standard. That is the difference between fixing a roof and finishing a roof.
It also stops the drip-drip of surprise costs. With a full package, you know what is included, what is optional, and what is not needed.
What a 3-Bed Semi Re-Roof Package Includes (Line by Line)
This is the transparent breakdown you should see on every quote. If any of these are missing, ask why.
1. Strip and Deck Check
We remove the old coverings and inspect the timber deck before anything new goes on. That is how we catch hidden rot early.
2. Breathable Felt and Treated Battens
This is the waterproof layer your roof actually depends on. We use modern breathable felt and treated battens designed for Irish weather.

3. New Roof Covering
Your new slates or tiles go on with proper fixings and spacing. This is where many cheaper quotes cut corners, and it shows after the first storm.
4. Ridge System
We reset ridges to current standards, or you can upgrade to a dry ridge system for longer life. This is a key water entry point, so it cannot be rushed.
5. Leadwork and Flashings
We renew leadwork at chimneys, valleys, and abutments. This detail stops most Dublin leaks, especially in older semis.

6. Waste Removal and Final Clean
We protect your driveway, remove all waste, and leave the site tidy. A professional re-roof should end cleanly, not with a skip in your garden.
Upgrade Bundles for 2026 (Pick One or Stack Them)
These upgrades are designed to add protection and reduce maintenance. Choose one, or stack them if your budget allows.
Upgrade 1: Dry Ridge + Dry Verge Bundle
Best for wind exposure in areas like Ongar and Ashtown. You get a maintenance-free ridge and verge system that does not crack or crumble like mortar.
What is included: Dry ridge system, dry verge caps, storm-proof fixings.
Upgrade 2: Gutter Refresh Bundle
If your gutters overflow every heavy rain, this is the easiest win. It protects your walls and prevents water tracking back under the roof edge.
What is included: Gutter clean, alignment check, downpipe flow test, and minor fascia touch-ups. For larger issues, we can pair this with a full gutter, fascia, and soffit repair.
Upgrade 3: Insulation Top-Up Bundle
This is the quiet money-saver. Better insulation keeps upstairs rooms warmer and reduces heat loss through the roof.
What is included: Insulation top-up to current depth targets, airflow checks, and safe access clean-up.
Need Expert Roofing Advice?
Unsure about your roof's condition? Get professional advice from our experienced Dublin roofing team. Free consultations available.
🎯 Expert Advice • Free Consultation • Local Team
7-10 Day Timeline: What Happens Each Week
A standard 3-bed semi re-roof in Dublin takes 7-10 working days. Weather shifts and access can stretch the schedule, but this is the typical flow.
Days 1-2: Setup and Strip
We scaffold, protect the site, strip the old roof, and inspect the deck. This is the messy part, and it is why the schedule starts strong.
Days 3-4: Felt and Battens
New breathable felt goes down, then treated battens. This locks in the water barrier early, so your home stays protected.
Days 5-7: Roof Covering
We install the new tiles or slates, line by line. This is the core build phase.
Days 8-9: Ridge and Leadwork
We finish the ridge and renew the leadwork around chimneys and valleys. This is where long-term leak prevention happens.
Day 10 (If Needed): Final Checks and Cleanup
We walk every slope, tidy the site, and run a final quality check. You get a clean finish and a clear handover.

How Much You Can Save vs Traditional Dublin Roofers
We do not publish exact prices, but we do track the quotes homeowners show us. For a typical 3-bed semi re-roof, our clients usually save 10-18% compared to larger Dublin roofing firms.
Here is what that looks like in practice:
Savings Call-Out: Many Dublin homeowners save up to EUR 2,200 versus large firms on a like-for-like 3-bed semi re-roof.
- Many homeowners save EUR 800 to EUR 2,200 on a like-for-like scope
- The savings are often higher in older areas like Navan Road and Phoenix Park
- The biggest savings come from transparent scope and lean overheads, not cut corners
We are a streamlined local team, not a sales-heavy operation. That difference shows up in your final quote and your stress levels.
Free Inspection and a Clear Scope
We do a free inspection and walk you through the scope in plain English. You will know exactly what is included, which upgrades make sense, and what the timeline looks like before you commit.
If you are serious about a 2026 re-roof, we can map the schedule early and keep the plan tight. No surprises. Just a clear, fair scope.
FAQs About Dublin 3-Bed Semi Re-Roof Packages
Frequently Asked Questions
Final Word: Lock in a 2026 Re-Roof Slot
If you want a roof that holds through every winter, the details matter. A clear scope, the right upgrades, and a reliable timeline remove the stress.
Book a re-roof assessment now. We will show you the exact line items, the 7-10 day plan, and the upgrades that make sense for your home.
Get Your Dublin 3-Bed Semi Re-Roof Quote
Ready to fix your roof? Get a detailed, no-obligation quote from Dublin 15's trusted roofing experts. Most quotes provided within 24 hours.
Free inspection - 7-10 day timeline - Local Dublin team

